What are you searching?

    Ras Abu Fontas 3 SWRO

    Design, construction and later operation and maintenance 

    Ras Abu Fontas 3 will have a capacity of 164,000 m3 per day and construction work on the plant will begin in the next few weeks. The off taker for the water produced will be Qatar General Electricity & Water Corporation (KAHRAMAA)

    The plant represent a real milestone in the world of desalination, as it is the first time that reverse osmosis technology will be used on a large scale in Qatar. To date, only evaporation technology was used to desalinate water. 

    General Information

    • Location: Al Wakra, Catar
    • Capacity: 164,000 m3/d 
    • Procedure: Reverse Osmosis
    • Type of contract: EPC + O&M (10 years) 
    • Population: 1 million

    discover other flagship projects

    Torrevieja SWRO

    Region of Valencia, Spain

    Plant construction and operation, covering operations and maintenance for a period of 15 years. 

    Beckton SWRO

    London, United Kingdom

    Design and construction of the first desalination plant in Great Britain.

    Move up