    Tudela WWTP

    General Information

    • Project: WWTP Tudela.
    • Entity: Municipal Board of Aguas de Tudela.
    • Location Tudela, Navarra. Spain.
    • Design flow: 20,416 m3/day.
    • Population: 40,122.

    Key points

    Pre-treatment:

    Large particle screens, sifting, desanding, deoiler and influent flow metre.

    Primary treatment:

    Sedimentation.

    Secondary treatment:

    Sedimentation and percolating filters. Mud recirculation / sedimentation

    Mud treatment:

    Digestion, dehydration.

    Miscellaneous:

    Deodorising.

    discover other flagship projects

    Sollano DWTP

    Basque Country, Spain

    Raw water canal running from the dam built off the Ordunte river, a tributary of Cadagua river, through the pumping stations of Ibarra and Berrón.

    San Jerónimo WWTP

    Andalucia, Spain

    The San Jerónimo WWTP consists of the Norte 1 and Norte 2 plants, with three trains (water, sludge and gas).

    Move up