We use proprietary and third-party cookies to improve our services and show you advertising related to your preferences through analysis of your browsing habits. If you continue browsing, we consider that you accept their use. You can get more information, and find out how to change your settings, in our Cookies Policy

What are you searching?

    Tudela WWTP

    General Information

    • Project: WWTP Tudela.
    • Entity: Municipal Board of Aguas de Tudela.
    • Location Tudela, Navarra. Spain.
    • Design flow: 20,416 m3/day.
    • Population: 40,122.

    Key points

    Pre-treatment:

    Large particle screens, sifting, desanding, deoiler and influent flow metre.

    Primary treatment:

    Sedimentation.

    Secondary treatment:

    Sedimentation and percolating filters. Mud recirculation / sedimentation

    Mud treatment:

    Digestion, dehydration.

    Miscellaneous:

    Deodorising.

    discover other flagship projects

    Sollano DWTP

    Basque Country, Spain

    Raw water canal running from the dam built off the Ordunte river, a tributary of Cadagua river, through the pumping stations of Ibarra and Berrón.

    San Jerónimo WWTP

    Andalucia, Spain

    The San Jerónimo WWTP consists of the Norte 1 and Norte 2 plants, with three trains (water, sludge and gas).

    Move up